Navajo Times
Saturday, June 20, 2026

Select Page

Author: Arlyssa Becenti

Paving of Chinle-Nazlini road celebrated

Jed Roanhorse from Chinle remembers when Navajo Route 27 was a dirt road when he was growing up. But after more than two years, the engineer for Navajo Engineering and Construction Authority stood proudly on the newly paved road he had a hand in building.

Read More

ADVERTISEMENT

Weather & Road Conditions

Window Rock Weather

Fair

55.9 F (13.3 C)
Dewpoint: 23.0 F (-5.0 C)
Humidity: 28%
Wind: calm
Pressure: 30.19

More weather »

ADVERTISEMENT