Navajo Times
Monday, July 13, 2026

Select Page

Author: Arlyssa Becenti

Paving of Chinle-Nazlini road celebrated

Jed Roanhorse from Chinle remembers when Navajo Route 27 was a dirt road when he was growing up. But after more than two years, the engineer for Navajo Engineering and Construction Authority stood proudly on the newly paved road he had a hand in building.

Read More

ADVERTISEMENT

Weather & Road Conditions

Window Rock Weather

Fair

73.9 F (23.3 C)
Dewpoint: 51.1 F (10.6 C)
Humidity: 45%
Wind: Southwest at 12.7 MPH (11 KT)
Pressure: 30.31

More weather »

ADVERTISEMENT